The foundation grouting and the track grouting plan are adopted to control the subsidence of the building,and the lifting grouting is employed to correct deviation of the building.
以厦门机场路一期工程梧村山隧道上方地表预留建筑物为试验对象,采取基础注浆加固和跟踪注浆的方案对建筑物沉降进行控制,并通过抬升注浆达到建筑物纠偏的目的。