Study on level displacement observed during the reservoir in Dachaoshan project;
大朝山重力坝蓄水期实测水平位移分析
This paper presents that during the first impoundment of Ertan reservoir in May 1998,mathematic relationship between the loads acting on the dam & the respondent displacements was established by use of statistic model & determined model theoretic analysis method based on the observation results of the plumblines installed in the dam & monitoring network surveying results.
简要介绍了在二滩拱坝1998年5月初次蓄水期,通过拱坝垂线和监测网系统,用统计模型和确定性模型理论分析方法,建立了施加于坝体各作用量与坝体受作用后的效应量(变位)间的数学关系;并根据预先计算分析成果,提出了在初次蓄水运行中拱坝变位的参考预报值,实时对二滩拱坝实际工作状态作出安全评判。
Analysis for water quality variation in TGP reservoir area before and after impoundment;
三峡工程蓄水前后库区河流水质变化分析
Analysis of and proposals for impact of TGP on water quality in reservoir area after impoundment;
三峡工程蓄水对库区水质的影响分析与建议
Study of impoundment scheme for Baise Multipurpose Dam Project;
百色水利枢纽下闸蓄水方案研究
Influence of water storage of Baise Multipurpose Dam Project on Baise city section of Youjiang river;
百色水利枢纽下闸蓄水对右江百色城河段水质的影响
In the course of planning design,by rationally choosing water storage reservoir,water collecting ways and pressure water diversion scheme for electricity generation,the installation capacity of the plant attains 103.
论述了在规划设计过程中,通过合理选择蓄水库、集水方式、和发电压力水输送方案,使电站装机达到103。
The water storage and flood control functions of marsh wetland were analyzed,based on the data of flood peak discharge monitored at Baoqing station and Caizuizi station in the Naoli river basin of the Sanjiang Plain from 1956 to 2000.
以三江平原挠力河1956~2000年宝清站与菜咀子站实测的洪峰流量为例,分析沼泽湿地的蓄水与调洪功能。
Characters of nitrogen and phosphorus of the Three Gorges Reservoir after impounding;
三峡水库蓄水后氮、磷营养盐的特征分析
Deformation and stability analysis of the slide mass in front of the dam of Lijiaxia Hydropower Plant before and after reservoir impounding;
李家峡水电站坝前滑坡蓄水前后的变形及稳定性分析
Safety appraisal for project impounding in Yinzidu hydropower station;
引子渡水电站工程蓄水安全鉴定
Study on influence of reservoir water impounding on reservoir landslide;
水库蓄水对库岸滑坡的影响研究?
Effective stress method of stress and deformation for soil-rock fill dam after water impounding;
蓄水后土石坝应力变形有效应力算法
The density changes before and after the first water impounding of Three Gorges Reservoir are inversed.
利用重复重力数据采用遗传算法反演地下异常体密度变化,通过模拟试算验证了该方法的有效性和稳定性,并反演了三峡水库第一次蓄水前后地下岩体密度变化。
Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号