This paper probes into how to estimate the cost by using scientific methods and how to compile the plan cost according to the cost estimation,and how to control and manage the cost according to compiled plan cost.
探讨了如何用科学的方法进行成本预测,如何根据成本预测编制计划成本,并根据编制的计划成本进行工程项目的控制与管理。
Although target cost,plan cost,estimated cost,fixed cost,standard cost are all cost control standards used in enterprises,yet some of them can be applied in a combination and others can not.
目标成本、计划成本、预算成本、定额成本、标准成本虽然都是企业进行成本控制的标准,但它们有的可以结合应用,有的却不能。
Fixed cost,planned cost,standard cost and goal cost are all standards under the control of the enterprise cost.
定额成本、计划成本、标准成本同目标成本都是企业成本控制的标准,它们之间存在一定的联系和区别,同时又以实际成本为参照标准。
Compilation and management on running cost plan for hydraulic construction enterprise;
水利施工企业成本计划的编制与管理
Research on the Integration Model of Cost Plans and Cost Funds Dividing Plans in Large Scale Discrete Enterprises;
离散制造企业成本计划与成本金分解计划集成控制模式研究
Analysis on the control of enterprises’ cost plan
浅析施工企业成本计划的控制
As an important part of cost management,cost planning is more and more important.
而成本计划,作为成本管理的重要组成部分,其重要性也就日益突显出来。
The article illustrates the importance of cost control in overall process of engineering construction,introduces the inventory of budge engineering cost planning and its implementing elements,and discusses the method and requirement of cost control,in order to increase the profit of enterprise and to ensure its invincible position in the market.
阐述了成本控制在工程施工全过程中的重要性,介绍了预算工程成本计划的编制以及计划实施要点,论述了成本控制方法及要求,以提高企业利润,保证企业在市场中立于不败之地。
In the light of this problem, this paper emphasized that we should combine these three goals in project management, and raise the method of system dynamics control method—earned value analysis method on the basis of the essential data earned value, cumulative budgeted cost, cumulative actual cost.
根据赢得值、累计计划成本额、累计实际成本额基本参数,采用系统动态控制的方法—— 赢得值分析法,着重研究成本— 进度之间的动态控制问题。
THE PROJECT COST-TIME OPTIMIZATION GRAPHICAL METHOD
工程计划成本—工期最优化的图示方法
LESS (Least Cost Estimating and Scheduling)
最低成本估计与计划
funding based upon uniform cost
按划一成本计算拨款
The cost accounting purpose for cost information relates to pi8"' ning and cost control.
成本会计需要成本资料主要是为了进行成本计划和成本控制。
single plan of standard cost accounting
标准成本会计的单一计划
He refused to adopt the plan on the grounds of its high cost.
他拒绝采纳这个计划,原因是成本太高。
How far does cost feature in your plan?
在你们在计划中成本占多大分量?
dual plan for standard costs
为标准成本制订的双重计划
The stigma of failure is attached to a cost reduction program.
降低成本的计划有了失败的痕迹。
The seven-year program to help 80 million people out of poverty has been in the main fulfilled.
"八七"扶贫攻坚计划基本完成。
Actively participates on continuous improvement and cost reduction.
积极参与持续改善计划和降低成本。
Commentary on the Higher Education Contribution Scheme in Australia;
澳大利亚高等教育成本分担计划概述
Cost and Optimal Warranty Length in Warranty Planning;
保修计划中的成本与最优保修期研究
Compilation and management on running cost plan for hydraulic construction enterprise;
水利施工企业成本计划的编制与管理
Accountants of, ten distinguish between product costs and pe- riod costs.
会计人员经常将成本划分为产品成本和期间成本。
He planned to finish the writing assignment that evening but he has come short.
他本来计划当晚完成写作任务,但是没能成功。
Research on the integration of MRPⅡ and ABC;
制造资源计划与作业成本法的集成研究