您的位置:汉字大全 > 行业英语 > 原子能 > underground reactor power plant是什么意思

underground reactor power plant是什么意思

中文翻译地下反应堆电站

网络释义

1)underground reactor power plant,地下反应堆电站2)breeder plant,增殖(反应)堆电站3)breeder plant,增殖[反应]堆电厂,增殖[反应]堆电站4)fast breeder (power) station,快[中子]增殖[反应]堆电站5)under water reactor,水下反应堆6)underground hydropower station,地下电站

用法例句

    Analysis on influence of flow velocity-flow regime and sedimentation on operation of underground hydropower station of Three Gorges Project;

    三峡工程地下电站前流速流态和泥沙淤积对电站运行的影响分析

    Its underground hydropower station is located in the layered rocks in soft and hard rocks check.

    水布垭工程地处灰岩狭谷河段,大坝高233 m,为目前世界上最高的面板堆石坝;地下电站位于软硬相间的层状岩体中;溢洪道最大泄洪功率3。

    The main powerhouse of Three Gorges underground hydropower station is with large span and thin cover, and it is rare internationally.

    三峡地下电站主厂房跨度大、覆盖薄,国内外少有。

    The Numerical Simulation of Air Distribution of the Underground Main Workshop in a Hydropower Station;

    地下电站高大厂房气流组织数值模拟

    Layout and maintenance of construction control network of Three Gorges Underground Powerstation

    三峡地下电站施工控制网布设与维护

    Research on Tailrace System of Tunnel with Sloping Ceiling in Right Bank Underground Hydropower Station;

    金沙江向家坝水电站右岸地下电站变顶高尾水系统研究

    Elementary Seismic Analysis of Underground Hydropower Cavern Groups

    水电站地下洞室群地震反应初步分析

    Construction of rock abuttal for bridge crane in an underground pumped storage power plant

    “广蓄”电站地下厂房岩壁吊车梁施工

    Construction Numerical Simulation of Cavern Group in Underground Hydropower House;

    水电站地下厂房洞室群施工数值仿真

    Research on XinHua 110kV Underground Substation Construction Management;

    新华110kV地下变电站建设管理研究

    Study on the Construction Characteristic of Underground Carvens Group for Goupitan Hydropower Station;

    构皮滩电站地下洞室群施工特性研究

    Concrete construction techniques for Three Gorges underground power hause

    三峡水电站地下厂房混凝土施工技术

    Construction Techniques of Rockbolting Beam in Underground Powerhouse at Baoxing Hydropower Station

    宝兴水电站地下厂房岩锚梁施工技术

    Analysis of seepage field for underground power house of Nuozhadu Hydropower Station

    糯扎渡水电站地下厂房区渗流场分析

    Problem is also encountered in connections between underground lines and substations.

    地下电缆线路与变电站联接时还会碰到问题。

    Investigation and Study on the Tax Collection on Real Estate of Underground Powerhouse Project of Hydropower Station;

    对征收水电站地下发电工程房产税问题的调研

    Supervision on the Underground Project and Lower Reservoir of Baoquan Pumped Storage Power Station;

    宝泉抽水蓄能电站地下工程及下水库工程监理

    Research on Dynamic Characteristics and Seismic Analysis of Underground Hydropower House;

    水电站地下厂房动力特性研究及地震反应分析

    A new method to invert nonlinear stress field of underground powerhouse at Jinping first stage hydropower station

    锦屏一级水电站地下厂区非线性地应力场反演

    The Discussion on Problems of Under Ground Substation Construction in Nanjing Urban District

    南京地区地下变电站建设相关问题的探讨

    Jiangya underground powerhouse has 33 chambers in different size.

    江垭电站地下厂房洞室群共有大小洞室33个。

Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号