您的位置:汉字大全 > 行业英语 > 建筑 > supervisory charge是什么意思

supervisory charge是什么意思

中文翻译监工费用

网络释义

1)supervisory charge,监工费用2)supervisory and overhead charges clause,监工及基本费用条款3)monitoring cost,监督费用4)expense supervision,费用监理5)time-cost,工期-费用6)construction cost,工程费用

用法例句

    For solving time-cost optimization problems of PERT(Program Evaluation and Review Technique) network plans,the model was represented with linear programming,and a particle swarm optimization algorithm was used to solve this problem.

    针对工程项目PERT网络计划工期-费用优化问题,尝试引入粒子群算法。

    Based on analysis of uncertainties in both project completion limit and expense in project negotiation scheduling of virtual enterprise, a multi-issue time-cost stochastic model was put forward.

    在分析虚拟企业项目协商规划的工期与费用的不确定性的基础上,提出了多属性工期-费用随机项目模型,以及工期-费用部分并行协商规划算法,以期望工期费用为优化目标,结合示例阐述其计算过程。

    On the application of value engineering in construction cost control;

    浅谈价值工程在工程费用控制中的应用

    Analysis of Time-cost-quality Trade-off in Engineering Project Management;

    工程项目管理中工期-费用-质量的权衡分析

    Research on Application of Time-Cost Optimization in Manufacturing Project of Port Machinery

    工期-费用优化在港机制造项目中的应用研究

    Analogy system for controlling quality time cost of construction projects

    工程项目质量工期费用控制模拟系统

    Time-cost Optimization and Its Ant Colony Algorithm in Network Plan;

    网络计划工期费用优化及其蚁群算法

    The Study of Time and Cost Claims Based on FIDIC Contract Conditions;

    FIDIC合同条件下的工期及费用索赔研究

    Study on the Cost Management in the Second Expansion Project of Power Plant of Tieling;

    铁岭电厂二期扩建工程费用管理研究

    Cost Control in Huanghua Port Phase I Project;

    关于黄骅港一期工程费用控制的体会

    shall pay for the latter's medical fees, nursing charges during treatment period and loss of income due to absence from work, and also -

    应当支付医疗费、治疗期间的护理费、因误工减少的收入等费用,

    Short time limit, less expense and conveniet operation are its feature.

    它的特点是工期短,费用少,施工操作简便。

    On Claim Damages and Duration Calculation within The New Edition of Conditions of Contract for Construction;

    新版《施工合同条件》中费用和工期索赔的计算

    Expense Claim for Construction Delay of International Water Conservancy Project;

    关于国际水利工程工期延误的费用索赔浅析

    Period of Construction Cost Optimization Model and Algorithm Design About Project Progress Adjustment;

    工程进度调整的工期—费用优化模型及算法设计

    The Application of the CE Method in Analyzing Project LCC;

    费用效率法在工程寿命周期成本分析中的应用

    On application of full life-span cycle cost theory in architectural projects

    全寿命周期费用理论在建设工程中的应用

    We agree to pay for the equipment and technology by installments with the processing fees payable to us.

    我方同意分期用我们应得的加工费偿付设备和技术的费用。

    Duration/Cost Trade-offs in Project Scheduling with Time-Switch Constraints under Multi-Cost

    多种费用下具有时间转换约束的工期费用均衡项目调度研究

    A Case of Claim on Construction Time-Limit & Expenses of Beijie Sluice Reinforcement Project;

    江门北街水闸加固一期工程工期及费用索赔实例

    Optimization of Expected Utility from Terminal Wealth and Consumption with Transaction Costs and Wages

    带交易费及工资的终端资产和消费期望效用最优化

Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号