您的位置:汉字大全 > 行业英语 > 建筑 > master schedule是什么意思

master schedule是什么意思

中文翻译进度计划总表

网络释义

1)master schedule,进度计划总表2)general schedule plan,总进度计划3)schedule graph,计划进度表4)schedule,计划表,进度5)schedule diagram,进度计划表6)Schedule,进度表进度计划

用法例句

    Brief analysis of schedule control methods of large and complex projects based on general schedule plan;

    简议大型复杂项目基于总进度计划下的进度控制方法

    General Schedule Planning Workout of Wind Power Plant Concession Project of Huitengliang 300MW;

    浅谈灰腾梁300MW风电特许权项目总进度计划的编制

    a production schedule

    生产进度[计划]表

    This is the schedule for the project.

    这是本计划的进度表。

    The main office gave us the green light for the plans.

    总公司已核准我们进行这些计划了。

    Regional Continuation Training Scheme [Hong Kong Police Force]

    总区进修训练计划〔香港警务处〕

    The president's plan gave fresh impetus to industry.

    总统的计划进一步推动了工业的发展。

    A presidential finding that authorized the covert operation.

    授权进行秘密行动计划的总统文件

    The next season was always the boundary of his planning.

    他的计划总是考虑到下一个季度为止。

    Plan and Control of Schedule in Telecommunication Design Project

    通信工程设计项目的进度计划与控制

    Yes. The president and I discussed this plan, and I'm very optimistic that he will adopt my suggestion.

    是的,我和老总就这个计划进行了讨论,我对他会采纳我的建议抱乐观态度。

    development programme

    发展进度表;发展进度计划;发展计划;建筑工程时间表

    Study on Schedule Risk Analysis in the Engineering Project Network Planning and Critical Chain Scheduling;

    工程网络计划进度风险分析及关键链进度计划法研究

    Everything at Gestapo headquarters worked out as I had planned.

    在秘密警察总部,一切都按照我的计划顺利进行。

    Regular meetings with the General Manager will be held to discuss the advancements and future business plans.

    经常性的和总经理进行会谈,讨论市场发展计划。

    The goal set by the Ninth Five-Year Plan (1996-2000) to reach an import and export volume of US$400 billion was met ahead of schedule.

    提前实现进出口总额4000亿美元的“九五”计划目标。

    Interface with clients to support their planning and scheduling requirements.

    与用户接触并支持其计划和进度要求.

    Keep her updated on your achievements and projects.

    要让她知道你最新工作进度和计划。

    Set up active plan according to project target and schedule.

    根据项目目标及进度制定行动计划.

Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号