Tunneling by tunnel boring machine(TBM)in unfavorable engineering geological conditions often incurs accidents from engineering geological problems when the lectotype and collocation of TBM are ignored.
当遇到不良工程地质条件,隧道工程施工选择全断面隧道掘进机(TBM)且对其选型和配置上未做充分考虑时,则往往出现各种工程地质问题。
To improve the capacity and efficiency of the design system of backup transportation scheme for tunnel boring machine(TBM),a new hybrid-solving method was proposed.
为提高隧道掘进机后配套运输方案设计系统的能力和效率,提出了一种工程装备方案设计的混合求解方法。
Industrialization and Development Orientation of Tunnel Boring Machine;
隧道掘进机产业化及发展方向
Using artificial intelligence to make a type selection of full face rock tunnel boring machine an intelligent design system was established.
针对隧道掘进机选型领域知识的特点,在知识获取中分别应用两种不同的机器学习方法:实例学习和类推学习,形成了一种协同推理模型;采用Microsoft公司的可视化集成开发工具Visual Foxpro 6。
Chongqing metro Line 6 is ready to adopt tunnel boring machine accounting for the requirements for fast development of urban rail transit and for reducing the effects on environment and traffic caused by traditional borehole-blasting.
为适应城市轨道交通快速发展的需要,解决传统钻爆法施工对城市环境、交通等方面的影响,推进城市隧道施工技术的发展,重庆地铁6号线拟采用隧道掘进机(TBM)施工。
Numeral simulation of TBM tunnel segments;
隧道掘进机管片衬砌受力的数值模拟
Application of TBM (Tunnel Boring Machine) in Engineering Construction;
隧道掘进机(TBM)在工程施工中的应用
Set up the TBM Industries for Promoting the Underground Space Development in China;
建立隧道掘进机产业 促进我国地下空间开发
Structure Analysis on Rock Tunnel Boring Machine Pipe Liner;
岩石掘进机隧道管片衬砌的结构分析
pattern recognition of full face TBM boring performance
全断面隧道掘进机掘进状况分类识别研究
Operation principle analysis of disc cutter on TBM
隧道掘进机盘形滚刀的工作原理分析
Alteration of Control System for Power of TB880E-type TBM
TB880E型隧道掘进机控制系统电源改造
Improvement of Motor Waterproof of Dust-exhaust System of TB880E-type TBM
TB880E型隧道掘进机除尘系统电机防水的改进
Set up the TBM Industries for Promoting the Underground Space Development in China
建立隧道掘进机产业 促进我国地下空间开发
Design of Control System for Auger-bore Microtunnelling Machine;
螺旋式微型隧道掘进机控制系统的设计
Briefly talking of industrialization and development ways of tunnel boring machine;
浅议我国隧道掘进机产业化及发展方向
Study of Cutter Layout Design of Full-face Rock Tunnel Boring Machine
全断面岩石隧道掘进机刀盘刀具布置方法研究
Study on Mechanical Behavior of Metro Tunnel Construction by Tunnelling Machine in Weak-Broken Surrounding Rock
软弱破碎围岩地铁隧道掘进机施工力学研究
Based on applicability of each type of TBM, users can select appropriate TBMs to meet their needs and geological conditions.
使用者可根据地质条件及特殊需要对隧道掘进机进行初步的选型。
A Model Experiment Study on Optimal Characters of Blocks on Self-drive Tunnel Excavating Machine;
新型自行走式隧道掘进机增阻结构合理形式模型试验研究
Study on Pattern Recognization of Tbm Boring Performance of Qinling Tunnel;
秦岭隧道全断面掘进机掘进状况识别分析研究
Structure Analysis on Rock Tunnel Boring Machine Pipe Liner;
岩石掘进机隧道管片衬砌的结构分析
coal or rock cutter and tunneling machinery ,self-propelled
截煤或截石机和隧道挖掘机械,自动推进
coal or rock cutter and tunneling machinery ,not self-propelled
截煤或截石机和隧道挖掘机械,非自动推进式
Theoretical Analysis of Special Section Tunnel Cutting Mechanism of Shield Machine;
盾构掘进机异形断面隧道切削机构的理论研究
Mechanical Analysis for Main Frame of Railway Soft Rock Tunnel Roadheader;
铁路软岩隧道臂式掘进机主机架力学特性分析
Study on the Simultaneous Lining Technology in the Long Tunnel Bored by Main Beam TBM
长大隧道敞开式掘进机施工中的同步衬砌研究