您的位置:汉字大全 > 行业英语 > 建筑 > television survey of drainage system是什么意思

television survey of drainage system是什么意思

中文翻译排水系统电视勘测工作

网络释义

1)television survey of drainage system,排水系统电视勘测工作2)exploration of hydrogeology and engineering geology,水工勘测3)working water system,工作水系统4)hydroelectric power station drainage system,水电站排水系统5)site drainage,工地排水系统6)artificial drainage system,人工排水系统

用法例句

    television survey of drainage system

    排水系统电视勘测工作

    BRIEF DISCUSSION OF MANAGEMENT AND ADMINISTRATION OF SURVEY AND DESIGN IN HYDRAULIC AND HYDROELECTRIC TRADES;

    浅谈水利水电行业勘测设计工作的经营及管理

    Improve the Survey Capability and Serve for the Unified Strong Smart Power Grid

    提升国网系统勘测水平 服务统一坚强智能电网

    Application of Twin-Power Supply in De-watering System of Full-mechanized Mining Face

    双电源在综采工作面排水系统中的应用

    The precipitation bailing planning of circulation water system construction of Wangtan electric power plant

    王滩电厂循环水系统施工降排水方案

    Recognition of the Enterprise Transformation and System Establishment of Shanxi Water Conservancy and Hydroelectric Power Survey &Design Institute;

    对山西水利水电勘测设计研究院改企建制工作的认识

    Five-year development and new achievement of hydropower construction:Review of investigation and design for West to East Power Transmission Project;

    五年大开发 水电谱新篇——贵州西电东送工程首批水电项目勘测设计工作回顾

    Researches on Surveying and Designing System in Road Engineering Based on PDA;

    基于PDA的道路工程勘测设计系统研究

    Distributed Wireless Industrial Sewage Waters Emissions Monitor System Based on GPRS Technology

    基于GPRS的分布式无线工业污水排放监测系统

    In the mine drainage system many drainage pumps must work correspondly.

    在煤矿井下的排水系统中,需要多台排水泵协调地工作。

    Depending on the system, area composition may achieve full page make-up, where no paste-up at all is needed.

    视乎系统的性能,区域排版可完成整版拼排工作而完全不需拼贴。

    Investigation and Design Process and Features of Gelantan Hydropower Station

    戈兰滩水电站工程勘测设计过程及特点

    It covers geometrically 86% of the 4t solid angle and has very low detection thresholds.

    整个探测器系统轴向对称排列,工作在真空中。

    hydraulic engineering geological exploratory survey

    水利工程地质勘察测量

    Design regulation for automatic system of hydrological data telemetering and forecasting of hydroelectric projects

    水利水电工程水情自动测报系统设计规定

    System Modeling of Visualization of Hydroelectric Project Construction

    水电工程施工过程可视化系统建模研究

    Remote Monitor and Operation System in Sewage Interception Step Pump Station of Xili Reservoir (Northeast Line)

    西丽水库(东北线)污水截排梯级泵站远程监视及操作系统

    General Adoption of the Market Principle of Standardization of Electric Power Survey and Design;

    浅谈电力勘测设计标准化工作市场化运行

Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号