您的位置:汉字大全 > 行业英语 > 建筑 > Shield driving method是什么意思

Shield driving method是什么意思

中文翻译潜盾施工法

网络释义

1)Shield driving method,潜盾施工法2)shield construction,盾构法施工3)shield construction,盾构施工法4)shield tunnel,盾构法施工5)Shield driving method,潛盾施工法6)construction of shield tunneling method,盾构法隧道施工

用法例句

    Viewpoints on type selection of shield equipments in shield construction;

    浅谈盾构法施工对盾构设备的选型

    2 of Guangzhou Metro,the analysis method is presented on ground surface subsidence induced by shield construction.

    以广州地铁二号线某区间隧道为背景,介绍了盾构法施工引起的地表沉降的分析方法,结合现场监测结果的对比分析,总结了地表沉降规律,对后续工程施工具有指导意义。

    Considering th characteristics of shield construction,a simplified two dimension FEM modeling is proposed and an appropriate calculation program is worked out in this paper.

    针对盾构施工法的特点 ,提出一种简化的平面有限元模拟方法 ,编制了相应的计算程序。

    So it is essential to study the stratum displacement caused by shield tunneling .

    本文论述了盾构法隧道施工对地层的扰动的影响,介绍了目前学者关于盾构法施工造成地表沉降的研究现状,利用大型有限元软件ANSYS对隧道开挖进行了数值模拟,对引起地表沉降的各种因素进行了比较分析,得出了地层纵向沉降和横向沉降以及水平位移的规律。

    So it is essential to study the stratum displacement caused by shield tunneling.

    本文论述了盾构法隧道施工对地层的扰动的影响,介绍了目前学者关于盾构法施工造成地表沉降的研究现状,利用有限差分软件FLAC对隧道开挖进行了数值模拟,对引起地表沉降的各种因素进行了比较分析,得出了地层纵向沉降和横向沉降以及水平位移的规律,从而提出控制沉降的措施。

    By applying FLAC3D numerical simulation, this paper mainly discusses the ground settlement caused by shield tunneling in terms of the particular geological condition in Chengdu, while taking the blocks between Tong Zilin Stop and Southern Train Station as background.

    盾构法施工作为成都地铁施工中一种主要的施工方法,其施工过程中不可避免的会对周围岩土体产生扰动,引起的地表沉降可能影响地面建筑物和既有管线设施,当地表沉降达到一定程度时将影响地面建筑物的安全和地下管线的正常使用。

    Earth pressure balance (EPB) shield is used most extensively in shield construction.

    土压平衡式盾构机是盾构法施工中应用最为广泛的盾构机。

    The Application of Shield Tunneling Method in No. 5 Tunnel of Luohui Canal;

    谈洛惠渠五洞工程手掘式盾构法施工

    Study on the Minimum Value of Curve Radius in Shield Construction;

    盾构法施工最小曲线半径取值的研究

    ANALYSIS AND REDUCTION MEASURES ON CONSTRUCTURE COST OF SHIELD TUNNEL

    隧道盾构法施工的成本分析和降低措施

    The Discussion of Water Diversion Tunnel Survey Work Using Shield Method Construction

    采用盾构法施工的引水隧洞勘察工作要点探讨

    Application of Shield Method in Non - Water Sandy Cobble Bed

    盾构法施工技术在无水砂卵石地层中的应用

    Experimental study on working parameters of EPB shield machine

    土压平衡盾构法施工参数的模型试验研究

    Design on Model Test of Tunnel Excavation with EPB Sheild Machine in Sand Stratum

    砂土地层盾构法施工的模型试验设计研究

    Study on Face Stability of Tunnelling Shield in Urban Areas;

    城市隧道盾构法施工开挖面稳定性研究

    Technology Research of Reinforcement at the Getting Into Shaft on the Shield Tunnel Construction Method on Soft Clay Region

    软土地区盾构法施工进洞加固技术研究

    On methods of the manual measurement of the shield machine posture in the subway shield station

    地铁盾构施工中人工测量盾构机姿态的方法

    The Application of New Austrian Tunneling Method on the shaft for shield tunnel

    新奥法在盾构竖井中的施工技术应用

    APPLICATION OF SOIL FREEZING REINFORCEMENT METHOD TO SHIELD TUNNELING ENTRY

    冻结法加固在盾构进洞施工中的应用

    Construction Techniques by Shield Tunneling Method in Upper-Soft Lower-Hard Ground

    上软下硬地层中盾构法隧道施工技术

    PREDICTION OF GROUND DEFORMATION INDUCED BY SHIELD TUNNELING CONSTRUCTION

    盾构法隧道施工引起的土体变形预测

    Overview of "Code for Construction and Acceptance of Shield Tunnelling Method" GB50446-2008

    《盾构法隧道施工与验收规范》GB50446-2008导读

    Research and Application of Top Down Construction in Vertical Shaft Structures of Shield Tunnels

    逆作法施工技术在盾构竖井施工中的应用

    APPLICATION OF TOP-DOWN CONSTRUCTION METHOD IN CONSTRUCTION OF SHIELD SHAFT LINING STRUCTURE

    逆作法在盾构井内衬结构施工中的应用