execution scheme drawing是什么意思

中文翻译施工计划图

网络释义

1)execution scheme drawing,施工计划图2)construction network scheme,施工网络计划图3)working plan,工作计划,工作图,施工图4)construction plan,施工计划5)construction program,施工计划6)construction schedule,施工计划

用法例句

    Through drawing the construction network scheme and analyzing the key route line, the author put forward the optimization, regulation and application of the CNS in hydropower project construction plans.

    通过对施工网络计划图的绘制及其关键线路分析 ,提出施工网络计划图在施工方案中的优化、调整及应用。

    This paper points out that before the construction of the coking oven,should compile the detailed and strict construction plan and construction period,and should implement the norms of the construction of the coking oven strictly,and puts forward some detailed methods for solving the problems frequently occurring in the construction of the coking ovens.

    提出了砌筑焦炉前首先应编制详尽严谨的施工计划与工期,砌筑中严格筑炉规范。

    It is not until the beginning of actual construction that the construction planner can realize the validity of his construction operations planning.

    工程施工计划是一项复杂的工作,不断增长的复杂因素决定了工程管理人员需要采取新的、从未被用过、检测过的工程施工方法。

    This paper describes and analyzes the relationship between FIDIC Contract Conditions and construction program preparation, implementation, management and construction progress control in the course of the construction of Paksey Bridge Project in Bangladesh, and also summarizes the experiences acquired in the implementation of the construction program in question.

    对孟加拉国帕克西桥项目实施过程中FIDIC合同条款与施工计划的编制、实施、管理和施工进度控制之间的关系进行了介绍和分析,并对项目计划执行过程中的经验进行了归纳与总结。

    Determining the optimal project construction schedule with rsource-based precedence relationships under multiple resource constraints;

    多资源约束下包含资源使用顺序关系最优施工计划的确定

    With the outstanding functions of spatial modeling and data processing of GIS,also its 3D visualization,we can give a satisfying dynamic model of the construction schedule,which will be a great help for the research and decision-making work of the project.

    利用地理信息系统(GIS)的空间建模及数据处理技术和三维可视化功能,实现了基于施工进度计划的工程三维动态模拟,为工程施工计划的编制提供了技术支持,对提高工程的研究和决策水平有重要的意义。

    The bad weather will set back our building plans.

    恶劣的天气将使我们的施工计划延后。

    The Application of Project 98 in Building Construction Planning Management;

    Project 98在建筑施工计划管理中的应用

    Design and Realization of Management Information System for Railway Construction Plan;

    铁路施工计划管理信息系统设计与实现

    Project Plan Execution- carrying out the project plan by performing the activities included therein.

    项目计划执行-行工序来实施项目计划。

    New Consideration on Designing Unit Construction Schedule;

    编制单位工程施工进度计划的新思路

    The artificial reef deployment project was implemented in two phases.

    人工鱼礁敷设计划分两期实施。

    Jung worked at a breakneck pace to execute her plan.

    钟废寝忘食地工作以实施其计划。

    CAD of Drip Irrigation in Agriculture Facilities;

    农业设施群的滴灌工程规划辅助设计

    Construction Schedule Control Technology under Multi-restrict Events;

    多约束事件下施工进度计划控制技术

    Compilation and management on running cost plan for hydraulic construction enterprise;

    水利施工企业成本计划的编制与管理

    RISK ANALYSIS OF CONSTRUCTION SCHEDULE WITH OPTIMUM CASH FLOW;

    最优资金流施工进度计划的风险分析

    Programme,Design and Construction of Coastal City Light Current Pipeline

    沿海城镇弱电管道的规划、设计与施工

    The Optimizing Project of Construction Network in Time-cost Algorithm of Engineering;

    工程施工网络计划中工期-成本优化方案

    Period Optimization Scheme Determination of Building Engineering Construction Network Plan

    建筑工程施工网络计划工期优化方案的确定

    Study on Network Planning Standardization Oriented to Construction Organization Design

    面向施工组织设计的网络进度计划标准化研究

    Teaching Computer Room Design and Construction of the Principles of the Planning

    教学计算机机房的规划设计及施工准则

    Construction Network Plan of Pit Botton in Changping Mine

    长平矿井底工程施工网络计划的编制与应用

    The March 1986 Program to stimulate the development of high technologies was implemented successfully.

    “863”计划顺利实施。