Based on the engineering construction of Fuzhou Port 10000 dwt Oil Terminal,this paper deals with the construction technology of jet-pile driving,problems met during construction,as well as the measures taken,and puts forward suggestions on improvement,serving as a reference for similar projects.
结合福州港万吨级油码头工程施工情况,探讨水冲沉桩施工工艺、施工中出现的问题以及采取的措施,并提出改进建议,可供类似工程参考。