您的位置:汉字大全 > 行业英语 > 建筑 > X-joints是什么意思

X-joints是什么意思

中文翻译四通管

网络释义

1)X-joints,四通管2)crosspiece,四通管3)four-way pipe,四通管4)PVC four-way pipe,PVC四通管5)improvement of cross tube,四通管改进6)casinghead spool,套管头四通

用法例句

    Finite Element Simulation and Technique Analysis of X-joints Hydroforming Process;

    四通管内高压成形有限元模拟及工艺分析

    The design of the injection mould for PVC four-way pipes was introduced.

    介绍了PVC四通管注射模设计 ,阐述了弯型芯的旋转抽芯过程以及模具顶出、回程及冷却系统设计。

    Flared type tube fittings--Union cross--Assembly

    GB/T5641.1-1985扩口式四通管接头

    Flared type tube fittings--Union cross--Body

    GB/T5641.2-1985扩口式四通管接头体

    Union cross-Assembly

    GB/T3746.1-1983卡套式四通管接头

    Finite Element Simulation and Technique Analysis of X-joints Hydroforming Process;

    四通管内高压成形有限元模拟及工艺分析

    X-joint Tube Hydroforming Processing Analysis Based on FEA

    基于有限元仿真的四通管内高压成形工艺分析

    axial flow resnatron

    轴向通量分米波超高功率四极管

    Simulation for structure capability of TC type four-channel coal burner

    TC型窑用四通道喷煤管结构性能仿真

    General Equipment Maintenance Management Organization Structure Design under the Construction Mode of "Four Match Four All"

    通用装备“四合四统”建设模式下维修管理组织结构设计研究

    Malleable cast iron pipe fittings--Type size--Crosses

    GB/T3289.20-1982可锻铸铁管路连接件型式尺寸四通

    Malleable cast iron pipe fittings--Type size--Reducing crosses

    GB/T3289.21-1982可锻铸铁管路连接件型式尺寸异径四通

    Design of the Communication Tower with the Composite Structure of the Square-shaped Steel Tube and Angle Steel

    四边形钢管角钢组合结构通信塔的设计

    Design and Realize of Integrated Network Management System for Sichuan Unicom Mobile Network;

    中国联通四川分公司综合网管系统设计与实现

    General Situation and Thinking of Emergency Telecommunication Construction in SEPC

    四川省电力公司应急通信建设管理概况及思考

    Study on Acoustic Transmission Loss in 4-channel Impedance Tube with Single-sensor

    单传声器四通道驻波管隔声量的测试研究

    Research on Management Innovative of Sichuan Tourism and Transportation Sustainable Development

    四川旅游交通运输的可持续发展管理创新研究

    4. Development of Information and Telecommunications Systems

    (四)信息通信建设

    Coordinate mllitary and police organization in advance to enforcer traffic control along the transport route and preclude road barriers.

    四预先协调军警机构于沿途实施交通管制及排除道路障碍。

    Phase 4 is approximately 7.5 km of hydrant pipe for the second new terminal.

    四期是大约7.5公里的消防管线,通往第二个新的终端设备区。

Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号