While after construction there are still plenty of dada that hasn t been delt with,thus the accounts can t be settled,which brings large lost for the enterprises.
然而在工程完工后,往往由于资料整理不及时或没有去整理或整理不规范,导致工程款得不到及时结算,从而无法支付,给施工企业造成了巨大的损失。
This paper focus on deploying resource,make use of the different completion probability of critical and un-critical path,the authors suggest a schedule optimization algorithm based on transferring resources from un-critical path to critical path purposely,and the result of applying the model shows that the method is practical for optimizing project schedule with resourc.
着眼于资源的调配,提出利用关键路线与非关键路线上完工概率的不同,有目的地将非关键路线上的资源调配到关键路线上进行进度计划优化的算法,并对该方法进行了算例说明,结果表明该法对资源约束下的工程项目进度计划优化具有实际意义。
Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号