Dam Construction Simulation System of Pubugou Hydropower Station based on Data driving;
基于数据驱动的瀑布沟水电站大坝施工仿真系统
Acceptance test of turbine model for Pubugou Hydropower Station;
瀑布沟水电站水轮机模型验收试验
Study on hydraulic model test of river closure in Pubugou hydropower station;
瀑布沟水电站截流水力学模型试验研究
Analysis of Pubugou Hydroelectric Power Station Underground Power House Rock Mass Seepage Field Impacts on Surrounding Rock Stability;
瀑布沟水电站地下厂房岩体渗流场对围岩稳定的影响分析
In regard to the continuity,abundance and safety,the relia-bility analyses on various schernes of electric one-line diagrain was made on the basis of reliability calculationof electric one-line diagram for Pubugou hydroelectric power station.
并结合瀑布沟水电站电气主接线可靠性计算,从供电连续住、充裕性、安全性等方面对各接线方案进行了可靠性分析,对SF6管道母线、500kV电缆等设备故障参数的不确定性,作了参数敏感性分析。
Application of TOFD technology in detection of welded spiral case
TOFD技术在瀑布沟电站蜗壳焊缝质量检测中的应用
Surrounding Rock Mass Classification of Underground Power House at Pubugou Hydroelectric Power Station on Dadu River;
大渡河瀑布沟水电站地下厂房围岩分类研究
Gravel-soil screening-conveying system for construction of Pubugou Hydropower Station
瀑布沟水电站施工砾石土筛分输送系统设计
Design and improvement of filter material processing system for construction of Pubugou Hydropower Station
瀑布沟水电站反滤料加工系统的设计与改进
Analysis on construction monitoring of gravel-soil core of rock fill dam of Pubugou Hydropower Station
瀑布沟水电站大坝砾石土心墙施工监测分析
Test of Surrounding Concrete of Steel Spiral Case Keeping Constant Internal Water Pressure in Pubugou Hydropower Station
瀑布沟水电站充水保压蜗壳结构模型试验
Construction quality control of dam foundation overburden in Pubugou hydropower station
瀑布沟水电站坝基覆盖层施工质量控制
Study on Stability Evaluation and Support Methods of the Kaergou High Steep Slope for Pubugou Hydroelectric Power Station
瀑布沟水电站卡尔沟料场高陡边坡稳定性评价及支护对策研究
On Importance for Construction of Pubugou Hydropower Station From View of Implementation of Interconnection of Networks and West-to-East Power Transmission Project;
从实施电网互联西电东送战略谈兴建瀑布沟水电站的重要性
To construct this hydropower station is a new milestone in the cascade development of Dadu River.
瀑布沟水电站的开工建设是大渡河梯级开发的一个新的里程碑。
Construction of Pubugou Hydropower Project on Dadu River Adapt to Advanced Productivity Development
建设与先进生产力发展要求相适应的大渡河瀑布沟水电站工程
Stability Analysis on Side Slope in the Spillway Chute Pubugou Hydroelectric Power Station under Different Function of Releasing Floodwater;
大渡河瀑布沟水电站溢洪道陡槽段雾化边坡稳定性研究
Stability Analysis of Surrounding Rock and Optimization of Supporting Structure in Pubugou Hydropower Station Diversion Tunnels;
瀑布沟水电站导流洞围岩稳定性与支护结构优化分析
Application of Gray System Theory in Discharge Tunnel Schedule Control at Pubugou Hydropower Station;
灰色系统理论在瀑布沟水电站泄洪洞工程进度控制中的运用
Static and Dynamic Analysis of the Outlet High Slope of the Tailrace Tunnel of Pubugou Hydropower Station;
瀑布沟水电站尾水隧洞出口高边坡静动力稳定性三维有限元分析
Deformation and Stability Analysis of Outlet Section of the Discharge Tunnel of Pubuguo Hydropower Station;
瀑布沟水电站泄洪洞出口段开挖变形及稳定性非线性有限元分析
Stablity Monitoring and Back Analysis of Displacement of Rockmasses Surrounding the Emptying Tunel in Pubugou Hydropower Project
瀑布沟水电站放空洞围岩的稳定性监测与位移反分析研究
Comprehensive Treatment of Side Slope in Highway of Pubugou Hydropower Station Submerging Area
瀑布沟水电站淹没区右岸公路边坡综合治理技术