It is not the best method , in the same time, the infection of consignment time, the burthen of equipment and overtime should be considered.
文章阐述了在流水线调度时,可利用遗传算法计算出工件的最短通过时间,但这并非最佳方案,应同时考虑交货期的影响、设备的负荷率和员工加班等问题。
Coordinating producer and supplier is one of main issues of supply chain with uncertain delivery.
供应链中在不确定JIT交货条件下如何进行供应商与生产商之间的协调是一个十分重要的问题。
Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号