您的位置:汉字大全 > 行业英语 > 地理 > flat seam是什么意思

flat seam是什么意思

中文翻译平矿层

网络释义

1)flat seam,平矿层2)horizontal ore layer,水平矿层3)horizontal sub-level mining,上向水平分层采矿法4)horizontal cut and fill mining,水平分层充填采矿法5)Upward horizntal cut stoping slicing,上向水平分层采矿6)ore bed,矿层

用法例句

    Characteristics of displacement and derformation of rockmass and horizontal ore layer(abbreviated as HOL below) in No.

    对于金川二矿区1#矿体水平矿层近年来随开采逐渐变薄而日渐突出的变形及稳定问题,采用FLAC3D软件对二矿围岩及水平矿层在开采过程中的位移及变形特征进行了分析。

    To deeply research the theory of locating the missing ore beds through faults on complicated geological conditions

    复杂地质条件下过断层寻找断失盘矿层理论研究

    Sulfur ore bed occurrence in submember of the No.

    自然硫矿层在汶口组二段上亚段,泥质灰岩-含泥灰岩-含云灰岩-石膏岩韵律层中的白云岩-石膏岩层段发育。

    horizontal cut and fill stoping

    水平分层充填采矿法

    timbered horizontal cut and fill stoping

    木支护的水平分层充填采矿法

    flat back cut and fill method

    水平分层充填开采法

    Unite Mining Test and Application of Shallow Hole Shrinkage Stoping Method and Up Level Slicing Filling

    浅眼留矿与向上水平分层充填法联合开采试验与应用

    The Application of the Cut and Fill with Mullock in Dongdashan Iron mine

    上向水平分层废石充填法在东大山铁矿的应用

    Study on Technology of Large Access Upward Horizontal Layer Cut and Fill Stoping with Hydrualic Props Roof Supporting

    水压支柱护顶大进路上向水平分层充填采矿工艺技术研究

    The upward horizontal slice stoping and filling without intervening pillar is the main mining method in Huangshaping Pb-Zn Mine.

    上向水平分层充镇无间柱采矿法是黄沙坪铅锌矿的主要采矿方法。

    Application of Room and Pillar Mining Method in Under-sea Deposit

    分矿房矿柱分层充填法在海底开采中的应用

    Application of the Upwards Cut-fill Mining Method in Ganzhou Uranium Mine and its Prospect

    上向分层充填采矿法在赣州铀矿的应用及展望

    rill cut and fill method

    倾斜分层充填采煤法

    Application of mechanized panel slicing backfilling mining method in Jilongshan gold mine

    机械化盘区分层充填采矿法在鸡笼山金矿的应用

    Discussion and Practice of Vertical Parallel Hole Caving Technology with Sub-level Filling Method

    分段充填采矿法垂直平行孔落矿技术探讨与实践

    The indoor experiment on the filling materials used for downward slicing drift mining with cemented bacKfill in Gaolong Gold Mine was performed.

    对高龙金矿下向分层进路胶结充填采矿法所用的充填材料进行了室内试验研究。

    overhand cut and fill

    上行分层采掘充填开采法

    top slicing combined with ore caving

    下向水平分层崩落采矿法

    square set and back filling method

    方框支架充填采矿法

    PRACTICE OF UPWARDS DRIFT HDRAULIC FILL MINING IN WUSHAN COPPER MINE

    武山铜矿上向进路水砂充填采矿法生产实践

    The Method of Downward Direction Lamination Tails Cemented Backfill Mining and Its Application and Practice in The DaLing Ore of JIEN Nickel

    下向分层尾砂胶结充填采矿法在吉林吉恩镍业大岭矿的应用与实践

Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号