The construction precision control method of the temporary columns on reverse method in pit supporting projects is researched in the paper.
研究了逆作法基坑支护工程中临时立柱施工精度的控制方法,分析了立柱差异沉降的因素以及控制措施,从而确保其在施工全过程中满足精度和沉降控制的要求。