您的位置:汉字大全 > 行业英语 > 海洋 > boxed dimension boxer是什么意思

boxed dimension boxer是什么意思

中文翻译制箱者装箱者

网络释义

1)boxed dimension boxer,制箱者装箱者2)boxer,制箱者装箱者3)control box,控制箱4)Controller,控制箱5)precast box girder,预制箱梁6)precast box beam,预制箱梁7)prefabricated box girder,预制箱梁8)prefabricated box culvert,预制箱涵9)prefabricated box beam,预制箱梁10)master controlling box,主控制箱

用法例句

    This control system includes two parts: rectifier cubicle and control box.

    该系统包括整流箱和控制箱两部分。

    The Controller Design for a Medium-frequency Mobile Power Station;

    移动式中频电站控制箱的设计及实现

    Analysis of high performance concrete construction technical scheme of precast box girders on passenger dedicated lines;

    客运专线预制箱梁高性能混凝土施工技术方案解析

    On the basis of the construction of precast box girder in urban-urban railway from Beijing to Tianjin, were discussed , which the construction technology and construction plan of the formwork engineering, steel engineering and concrete engineering etc.

    结合京津城际轨道交通线预制箱梁施工,探讨了客运专线条件下箱梁的施工过程中的模板工程、钢筋工程、混凝土工程等的施工方案和施工工艺,并对箱梁的检查验收和施工注意事项做了论述。

    in the construction of precast box beam for reference.

    介绍了预制箱梁施工中如何控制质量,防止木芯模上浮,控制张拉、压浆等关键工序等,理论联系实际,有一定实用价值。

    The slip method for transporting the precast box beams of Donghai Bridge is adopted in Shanghai municipal deep water harbour engineering.

    上海市深水港工程东海大桥 ,上部结构预制箱梁在预制场内采用滑移方式运输。

    in the construction of precast box beam for reference.

    介绍了预制箱梁施工中如何控制质量,防止木芯模上浮,控制张拉、压浆等关键工序等,理论联系实际,有一定实用价值。

    70m prefabricated box girder erection for Donghai Bridge;

    东海大桥70m预制箱梁架设施工

    The paper mainly introduces the elongation calculation method about the prestressed steel strand of prefabricated box girder and the measurement, and discusses the problems that exist in the elongation indicator computation method about steel strand of prefabricated box girder by comparing with the construction of segment in NingHang expressway.

    本文主要介绍预制箱梁的预应力钢绞线伸长量的计算方法及张拉伸长量的量测方法,对照宁杭高速公路宜兴一标段预制箱梁的钢绞线伸长量计算方法及张拉量测中出现的问题进行探讨。

    The application of rubber extract pipe on prefabricated box beam in high-speed railway;

    橡胶抽拔管在高速铁路预制箱梁中的应用

    The construction of the prefabricated box beam is more difficult than that of the T-shaped beam.

    预制箱梁的施工较T型梁难度大。

Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号