The paper establishes the design scheme of Wushiji grain dock and transfer barn based on the different demands of transfer content,load and unload from goods train (truck)and buck ship through comparison and analysis to some design schemes and technology processes.
本文根据江西乌石矶粮食专用码头及中转库年中转量,散装船舶、火车、汽车装卸作业的不同要求,对库区内主要作业系统、工艺流程及各工序作业功能,进行了多种方案的比较,对工艺设计中的关键技术问题进行了分析,确定了合理的工艺设计。
Research on Transfer Routing Problem of Railway Regular Package Delivery;
普包径路选择问题是按照客户对递送时间和费用的要求,合理安排每批货物的运送车次和中转车站,实现货物的快速、安全送达,是普包运输组织的核心问题。
Establishment of optimization model for location of municipal solid waste transfer station and its application;
城市垃圾中转站选址优化模型的建立及其应用
Design of control system on garbage transfer stations;
垃圾中转站控制系统的设计
To counter technological process of injecting chemical reagents into oil piping of oil recovery transfer station,the automatic feeding device is designed
针对采油中转站向管道内注入化学药品的工艺流程 ,而设计的配套自动化药品加注系
Analyzing 97 cases Conversion Laparotomy during Laparoscopic Cholecystectomy;
腹腔镜胆囊切除术中转开腹97例分析
Analysis of risk factor and establishment of scoring system for predicting laparoscopic colorectal surgery conversion to open surgery;
腹腔镜结直肠切除术中转开腹风险因素分析及评分系统初步建立
Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号