您的位置:汉字大全 > 行业英语 > 冶金 > detachable bottom是什么意思

detachable bottom是什么意思

中文翻译可换炉底

网络释义

1)detachable bottom,可换炉底2)interchangeable vessel,可换转炉3)Furnace bottom,炉底4)bottom,炉底5)hearth bottom,炉底6)hearth,炉底

用法例句

    The reasons of CaSi furnace bottom rising are analysed,the operation procedure to prolong smelting CaSi period in 1MVA electric furnace and the remarkable results achieved are expounded.

    对硅钙电炉炉底上涨原因进行了分析,并阐述了延长 1MVA硅钙电炉生产周期的工艺操作方法及所取得的明显效果。

    On the basis of analysis to the operation of first generation of comprehensive furnace bottom made with loam brick and carbon brick in No.

    对宣钢8 号高炉第一代粘土砖与炭砖综合炉底使用情况进行分析后提出了大修中采用半石墨化自焙炭砖—陶瓷杯复合炉缸炉底结构的必要性及其具体改进方案。

    This isothermal line can be regarded as the final decision line to termine the corrosion inside the blast furnace bottom.

    用有限元方法计算了宝钢三号高炉炉缸、炉底的二维稳态传热过程,得到了该高炉的1 150℃等温线,该等温线可以看作高炉炉底的侵蚀终止判定线。

    Optimization of Bottom Ramming Material of MgO-CaO-Fe_2O_3 System for Electric Arc Furnace;

    MgO-CaO-Fe_2O_3系电弧炉底捣打料的优化

    Experiment on Properties of Conductive Ramming Mixes for DC-EAF Bottom;

    直流电弧炉炉底导电捣打料的性能试验

    Laboratory Steelmaking Test of Conductive Brick for DC Arc Furnace Bottom;

    直流电弧炉炉底导电砖的炼钢试验

    The hearth and hearth bottom life of blast furnace is one of the key factors affecting blast furnace life.

    高炉炉缸和炉底的寿命是影响高炉长寿的关键因素之一。

    bottom two way fired pit

    炉底双侧烧嘴均热炉

    The bottom or receptacle in a silver-refining furnace.

    "炼银炉底部,炼银炉容器"

    rammed bottom lining

    捣筑(的)衬底, 捣筑炉底

    Carbon ramming material is used on the spacer,the bottom of blast furnace and some other parts of the blast furnace.

    高炉炉底垫层、炉底和炉缸环行碳块与炉壳间的间隙,炉底水冷管以上到炉底钢板。

    bottom lining temperature recorder

    炉底砌体温度记录仪

    The bottom of a reverberatory furnace, where ore is exposed to the flame.

    炉底矿石在此暴露在火焰中的反射炉的底部

    Strength Calculation of Walking Beam Furnace Hearth Structure by Using Finite Element Method

    步进底式加热炉炉底结构有限元强度计算

    a heat-resistant material used to line puddling furnaces.

    搅炼炉的打炉底隔热材料。

    Installation of bottom equipment of stepping girder furnace;

    浅谈步进梁式加热炉炉底设备的安装

    Remaking the Electric Furnace with Applying the Technique of Tapping from Eccentric Furnace Bottom;

    采用偏心炉底出钢技术改造炼钢电炉

    Simulation of Temperature Field and Stress Field in the Hearth and Bottom of Laiwu Steel's No. 3 BF

    莱钢3~#高炉炉缸炉底温度场和应力场模拟

    Simulation Calculation and Analysis of Hearth and Bottom Temperature Field of HISGC BF No. 1

    杭钢1号高炉炉缸、炉底温度场模拟计算及分析

    Calculation and application of erosion profile of BF hearth linings

    高炉炉缸炉底内衬侵蚀形貌的计算和应用

    Numerical Simulation of Hearth and Bottom Temperature Field on Jigang No. 2 Blast Furnace

    济钢2号高炉炉缸炉底温度场数值模拟

    An Elementary Introduction to Breakage Mechanism of Furnace Bottom of No. 11 BF at AISC and Its Masonry Form

    浅谈鞍钢11号高炉炉底的破损机理与砌筑形式

    Operation Attempt on Destroyed Water Seal in Suppercritical Once-through Boiler

    超临界直流锅炉破坏炉底水封运行尝试

    Summary on the Installation Technology of Hearth Mechanical Equipment of Walking Beam Furnace

    浅谈步进式加热炉炉底机械设备安装技术

    Control Model Analysis of Rotary Hearth Furnace's Mechanical Drive

    环形加热炉炉底机械传动控制方式分析

Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号