Installation and check of the atom fluorescence spectrum;
SK-2003Z型原子荧光光度计的安装与验收
About installation and checking of large medical equipments;
浅谈大型医疗设备安装与验收工作的组织
This paper mainly introduces several aspects of management of medical equipments in our hospital such as purchase, check in,use,maintenance,metrology and scrapping.
主要阐述了我院医疗设备管理过程中的采购、验收、使用、保养、维护、计量直至最后报废各环节的做法。
Studying on quality of the pig iron for steelmaking to be check before acceptance;
外购炼钢生铁的质量验收的实践
The normative acceptance of medical equipment;
医疗设备的规范验收管理
Construction of rural water supply project and quality acceptance;
农村供水工程施工及质量验收
For automotive brake system ductile casting QT450-12,in case of ensure mechanical property,internal and external automotive casting provider have greater discrepancy in casting microstructure and composition at check and accept that,most of internal company only concerned the pearlite content,but aboard company more concerned graphite form.
对于汽车用铸态制动类球墨铸铁QT450-10铸件,在保证力学性能符合要求的前提下,国内外汽车铸造厂商对铸件组织和成分的验收存在明显的差异,国内企业强调铸件珠光体含量的验收指标,国外企业更重视铸件石墨组织的验收。
Some existing problems are pointed out during on-spot monitoring for check and accept of completed project.
针对建设项目竣工环境保护验收监测中存在的一些疑难问题,分别从废水监测中采样点位的确定和描述及采样时间的确定、清污合总排口的情况下监测点位的确定;厂界噪声监测中测点的选择、背景值的修正与测量、环境敏感点的监测;废气监测中无组织废气监控点的布设、有组织废气采样方法的选择、燃烧性废气监测中过剩系数的影响;验收监测期间的生产工况的确定等方面进行了探讨,提出了一些解决办法。
Following article mainly discuss some basic principles of how to choose ,check and accept the sampling machine for coal flow sampling.
主要论述了在煤流中采样使用的采样机的选择和验收中的一些基本的原则。
The necessity of acceptance check of CNC machine tool is introduced,the procedure of acceptance check and problems that should be paid attention is described.
介绍了数控机床验收的必要性,对验收过程和应注意的问题进行了阐述。
The procedure and content of acceptance check for chemical engineering construction project are introduced systematically.
结合作者的实际工作 ,总结了对工程建设实施“三道质量控制工序”的经验 ,强调了过程质量控制的重要性 ,较为系统地介绍了化工建设项目预验收工作的程序和内
As the final step of the execution of the equipment purchase contract, acceptance check is very important for proper operation of the equipment.
为确保新购医疗设备能正常地、安全地运行,验收工作是十分重要的,它是装备购置合同执行中的最后一个环节。
CFRP sheet strengthening for a certain project and the check and acceptance of strengthening quality;
某工程碳纤维布结构加固及其加固质量的检查与验收
The monitoring of environmental protection check and acceptance of CFB boiler shows that the total desulphurization rate reaches from 93.
通过循环流化床(CFB)废气污染源验收监测,CFB锅炉的总脱硫效率可达93。
Based on the practical experience in the production of concrete interlocking block of Yangpu Port Phase II Project, it introduces the key factors of experiment, production, quality control, as well as check and acceptance of concrete interlocking block.
结合洋浦港二期工程混凝土联锁块生产的实践经验,简述混凝土联锁块试验、生产、质量控制及验收等要素。
Copyright © 2022-2024 汉字大全www.hanzidaquan.com All Rights Reserved 浙ICP备20019715号