By the running tests of automobile,marine in inland river,stationary set of generator and full scale engine on bench,the practical economy of middle & high grade diesel engine oil from oil decay,machine parts wear,consumption of fuel oil and detergence evaluation of engine was studied overall.
通过汽车、内河船舶、固定式发电机组及全尺寸发动机台架的运行试验,对国产中高档柴油机油使用经济性从油品的衰变、机件磨损、机燃油的消耗以及发动机清净性评定进行了全面的研究,为指导用户合理用油和内燃机油配方研究提供了可靠的依据。
The MLX01 superconducting maglev vehicles have entered their seventh year of running tests on the Yamanashi Maglev Test Line (YMTL).
在山梨磁悬浮试验线(YMTL)上对MLX01超导磁悬浮列车进行的运行试验已进入第7个年头。
3 in Wulashan Power Plant has been realized,and operation test of the retrofitted boiler being carried out.
对改造后锅炉进行了运行试验,结果表明,脱氮效果明显,锅炉效率也有提高。
parallel operation test for generator set
发电机组并联运行试验
Installation and running test or cadmium nickel battery adopted on passenger car
客车采用镉镍蓄电池的装车运行试验
Experimental Research for Optimization Operation of Pulverized Coal Mill System with Intermediate Storage Bunker;
中储式制粉系统的优化运行试验研究
TEST STUDY ON OPTIMIZATION OF OPERATION FOR 300MW STEAM TURBINE
330MW汽轮机组优化运行试验研究
Emergency operation test of windlass/load/start/stop shall be carried out.
进行锚机/负载/起动/停止/应急操作的运行试验。
Operation test of all major equipment working for M.E., Run normally、eligibly.
5服务于主机的各种设备进行了运行试验,运行正常、合格。
Experimental Study on the Operational Effects of Biological Aerated Filter;
曝气生物滤池运行影响因素试验研究
Experiment Research on Extending the Operation Range of Gasoline HCCI Combustion;
拓展汽油HCCI燃烧运行范围的试验研究
Experimental Study of Composite Insulators on Long-term Performance
复合绝缘子的长期运行性能试验研究
TEST STUDY ON OPERATION CHARACTERS OF ZGM-113G MEDIUM SPEED COAL PULVERIZER
ZGM-113G型中速磨煤机运行特性试验研究
Combustion Adjustment and Optimization of a 1025t/h Boiler
1025t/h锅炉燃烧调整试验及优化运行
Research on Abnormity about Induced Fan in 300MW Power Plant
300MW机组引风机运行异常试验研究
Research on operation and management of NASA's wind tunnel testing facilities
NASA风洞试验设备运行与管理研究
Performance improvement of SBR process by addition of humus soil
腐殖土强化SBR工艺运行效能试验
Intelligent Running and Monitoring of Laboratory Synthetic Circuit Test System;
实验室合成回路试验系统的智能运行与监测
And now it's running smoothly which validate the rightness and feasibility of the theory.
目前试运行良好,验证了理论的正确性和可行性。
Comparison of heart rate and blood pressure of pilots between exercise test and tilt table test
飞行员运动试验与倾斜试验后心率和血压变化的比较
Every pumps interrelated in system should be run and is ok before test.
系统各水泵已在试验前进行运转,且工作正常。