Since the equipment of Inadequate Core Cooling Monitoring System(ICCMS) applied in Qinshan phase II project has not been produced any longer,TXS will be applied in ICCMS as an alternative choice in Qinshan phase II extension project.
由于秦山核电二期工程中使用的堆芯冷却监测系统机柜已停产,所以在秦山二期扩建工程中采用了安全级数字化仪表控制系统(TXS)作为堆芯冷却监测系统的处理平台。
Reliability Analyse and Test Frequency Optimization of Motorized Isolation Valves of Emergency Core Cooling System;
应急堆芯冷却系统电动阀的可靠性分析及试验频率优化
reactor core isolation cooling system
反应堆堆芯隔离冷却系统
primary reactor coolant system
反应堆一次冷却系统
charging/make-up flow [reactor coolant system]
上充/补给水流量〔反应堆冷却剂系统〕
reactor building cooling water system
反应堆建筑物冷却水系统
reactor coolant system dose equivalent
反应堆冷却剂系统剂量当量
Measurements for monitoring adequate cooling within the core of pressurized light water reactors
GB/T13632-1992监督压水堆堆芯充分冷却的测量要求
A soft-measuring method to measure the core coolant temperature at the outlet of a nuclear heating reactor
核供热堆堆芯冷却剂出口温度的软测量方法
Investigation on Piezo-pump Used in Water-cooling-system for Computer CPU Chip
压电泵在CPU芯片液体冷却系统中的应用研究
Research on the Technique of Distributed Control System for Pressurized Water Reactor Coolant System;
压水堆核电厂主冷却剂集散控制系统技术研究
Numerical simulation of temperature field of pump support cooling system for China experimental fast reactor
中国实验快堆泵支承冷却系统温度场分析
Improvement and practice of speed measurement system for reactor coolant pump
反应堆冷却剂泵转速测量系统改进设计及实践
core spray recirculation system
堆芯喷淋再循环系统
Source Terms Calculation Analysis for the Reactor and Primary Coolant System of Qinshan Phase II NPP Project
秦山核电二期工程反应堆及反应堆冷却剂系统源项计算分析
Design of the Reactor and Reactor Coolant System for Qingshan Phase II NPP Project
秦山核电二期工程反应堆及反应堆冷却剂系统设计
No refrigerant in the refrigerant system.
冷却系统中没有冷却剂。
Mechanical Analysis of Reactor Coolant System for Qinshan Phase II NPP Project Main Coolant System and Auxiliary System
秦山核电二期工程反应堆主冷却剂系统与辅助系统力学分析
Modeling and Simulation of the PWR Core and Its Control Systems;
压水堆堆芯系统建模及其控制系统仿真研究